Informa helps businesses and professionals in hundreds of ways.

Our international portfolio of live events, world-leading research publications, and innovative digital services provide specialists with the knowledge and connections they need to thrive.

Data Center World
May 24-27, 2027
Music City CenterNashville, TN
May 24-27, 2027 |Music City Center, Nashville, TN

Operators shortlist the firms they've met. Make sure yours is one of them.

AI is not only changing what data centers operators build, but who they choose to trust to build it.

As AI and its requirements reshape what operators need, we've seen long-established benchmarks blown past. Campuses that, just a few years ago, were aiming for 50 MW are now being planned at 200 MW. And racks that once ran at 10 kW are now pushing past 50 kW.

So, with the blueprint being rewritten, operators are looking for design, construction and FM partners who can prove they're ready for it.

Data Center World is the best place to make that case and put proof in front of the owners, engineers and facility leads deciding what gets built next, while their projects are still taking shape.

Not every firm that claims data center experience will be remembered.

It’s not only that the bigger, denser, and faster builds operators are planning are placing higher demands on architecture, engineering, construction, project management, and facility management partners. But with every capability statement promising the same mission-critical expertise, operators are relying less and less on finding partners through an RFP.

Instead, they’re leaning on firms they already trust, on peer referrals and holding on one question: "who designed your facility?"

Over the four days in Nashville, Data Center World becomes the place that question gets answered. Here, operators come to learn about the market, compare approaches and meet the teams behind the next generation of facilities.

DCW Expo Hall

The operator side of the decision all in one room.

Data Center World brings operators together with the vendors and partners around them. You'll meet:

  • Operator leadership: owners, executives and heads of data centre strategy, deciding what gets built, expanded or retrofitted
  • Facilities and operations: facility managers and operations directors stretched by workforce gaps, outsourcing more FM and often the first to ask a peer, "who do you use?"
  • Engineering: data centre, power and cooling engineers testing whether a firm really understands high-density design and liquid cooling integration
  • Sustainability, risk and compliance: leads setting the targets and regulatory requirements new builds have to meet

Why being there matters.

Source: DCW 2026 post-show attendee survey


%

attend to learn about the market

%

are more likely to consider buying from a vendor they saw at the show

%

say attending is important to their role

A 10 kW portfolio doesn't win a 200 MW brief.

The facilities behind AI are on a different scale - average rack density has climbed from 16 kW to 27 kW in a single year, and 36% of operators already run liquid cooling, with another 28% planning to within two years.

All that has changed what operators look for in a partner. For instance, a reputation built on air-cooled halls doesn't prove a firm understands liquid cooling. And when capabilities are too closely tied to how the industry used to look, they can even work against a firm.

Operators want proof a firm can handle what AI builds bring with them, from designing cooling in from day one to lining up trade partners who can keep pace.

Source: AFCOM State of the Data Center 2026

Get on the shortlist before the project is scoped.

Hear the live brief

Operators share the problems they're working through now, months before they become a scope of work. Be in the conversation while the project is still taking shape.

Prove it in person

On paper, every firm has mission-critical experience. On the floor and on stage, your project team can show how it solved a challenge like the one an operator is facing now.

Show who you are now

Operators judge firms on what they see in Nashville, not on a portfolio from five years ago. Put your high-density, liquid-cooled and modular work in front of them.

Meet your teaming partners

OEMs, contractors, integrators and trade partners are on the same floor, so you can build the referral network and supply chain that AI builds depend on.

Dave Bell

VP of Data Center & Micro Grid Development

Volta Grid

Data Center World brings together people from all parts of the industry - from cooling to power to build and construct. It covers the entire data center lifecycle, which is exactly what we need.

The 2027 shortlist is being built in Nashville. Make sure your name is on it.

Data center programmes run for years, and operators notice which firms keep showing up. Let's work out what a presence at Data Center World 2027 should look like for your team.