One Industry. Boundless Innovation. One Night to Celebrate It All.
The Data Center Awards Program celebrates the people, projects, and innovations driving the data center industry forward. From groundbreaking facility designs and sustainability achievements to standout leadership and operational excellence, the program recognizes the organizations and individuals setting new standards across the industry. Open to operators, builders, designers, energy providers, and solution providers alike, the Data Center Awards Program shines a spotlight on the achievements shaping the future of digital infrastructure — honoring innovation, impact, and excellence across every corner of the ecosystem.

Where Data Center Excellence Gets Its Due
Important Dates
Submission Portal Opens: Monday, November 16, 2026
Submission Portal Closes: Friday, January 15, 2027
Finalists Announced: Week of March 22, 2027
Awards Night: Tuesday, May 25, 2027
Categories
People and Leadership
Operation and Innovation
Impact Awards
Energy, Sustainability and Impact
Design and Construction
Award Descriptions by Category
People and Leadership
Rising Data Center Leader of the Year
This award recognizes an individual early in their data center career who has demonstrated exceptional promise, initiative, and impact within the industry. The winner will have shown a clear trajectory of growth, taken on responsibility beyond their experience level, and contributed meaningfully to their organization's success — whether through technical skill, leadership potential, mentorship of peers, or innovative problem-solving. This category celebrates the next generation of talent shaping the future of the sector.
Entry Criteria:
•Entrant must be under 35
•A written statement outlining the nominee's career progression, key achievements, and impact to date.
•At least one supporting reference or testimonial from a manager, mentor, or senior colleague.
•Evidence of initiative, such as a specific project led, a problem solved, or a measurable contribution to the business. •Optional: examples of mentorship, community involvement, or industry engagement (speaking, writing, volunteering).
Data Center Team of the Year
This category celebrates a data center team that has delivered outstanding results through collaboration, resilience, and shared expertise. Judges will look for evidence of measurable business impact, effective problem-solving under pressure, and a culture that drives performance and innovation across the organization.
Entry Criteria:
•Entry must identify the team, its function, and organizational context, including team size and scope of responsibility. •A written submission describing the team's objectives, challenges faced, and outcomes achieved over the judging period (the past 12-18 months).
•Quantifiable performance data where possible (e.g., uptime improvements, cost savings, incident reduction, efficiency gains).
•Evidence of collaboration, culture, and how the team worked together to achieve results.
•Optional: testimonials from internal stakeholders, clients, or leadership.
Data Center Industry Leadership Award
This award recognizes an individual whose leadership has made a lasting and significant contribution to the data center industry. The winner will have a strong track record of vision, influence, and impact — someone who has helped shape the direction of the sector, championed meaningful change, or set a standard for others to follow. This category honors leadership that extends beyond a single organization to the industry as a whole.
Entry Criteria:
•Nominee should have a minimum of 10-15 years in the industry, with a demonstrable record of leadership at an organizational or sector level.
•A detailed written submission describing the nominee's leadership contributions, key decisions, and influence on the industry.
•Evidence of impact beyond a single organization — such as shaping standards, driving sector-wide change, or influencing peers and policy.
•Supporting testimonials from senior industry figures, peers or partners.
•Optional: media coverage, speaking engagements, publications, or other evidence of broader industry recognition.
Operation and Innovation
Operational Performance Project of the Year
This award recognizes a project that has delivered measurable improvements in data center operational performance — such as uptime, efficiency, reliability, or process optimization. The winning entry will demonstrate a clear before-and-after impact, supported by data, showing how operational excellence was achieved through strategic planning, process innovation, or technology adoption.
Entry Criteria:
•Entry must describe a specific operational project completed or substantially implemented within the eligibility period (the past 12-18 months).
•Clear baseline and post-implementation metrics demonstrating performance improvement (e.g., PUE, uptime, MTTR, efficiency ratios).
•A written submission outlining the challenge, approach, implementation, and measurable results.
•Supporting data, charts, or third-party verification where available.
•Optional: client or stakeholder testimonials confirming impact.
Technology Innovation Project of the Year
This award honors a project that has introduced a novel or disruptive technology solution within a data center environment. The winning entry will stand out for the originality of its approach, the technical complexity overcome, and the tangible benefits delivered — whether in performance, scalability, or operational agility. This category celebrates genuine innovation that pushes the industry forward.
Data Center Modernization Project of the Year
This award recognizes an outstanding project that successfully modernized, upgraded, or transformed an existing data center facility to meet current and future demands. The winning entry will demonstrate how technical challenges were addressed, what efficiency or capacity gains were achieved, and how the project delivered lasting value — particularly where modernization was balanced against minimal operational disruption.
Entry Criteria:
•Entry must identify the facility, scope of the modernization, and timeline of the project
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written case study outlining the original facility condition, the challenges addressed, and the modernization approach taken.
•Before-and-after performance data (e.g., capacity, efficiency, energy use, lifespan extension).
•Evidence of how operational disruption was managed during the project.
•Optional: photographs, technical drawings, or third-party validation of results.
Supply Chain Collaboration Project of the Year
This award celebrates a project built on exceptional collaboration between a data center operator and its supply chain partners. The winning entry will demonstrate strong partnership, shared problem-solving, transparent communication, and outcomes that would not have been possible without close cross-organizational cooperation.
Entry Criteria:
•Entry must name all key partner organizations involved and describe each party's role in the collaboration.
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A joint or co-authored written submission is encouraged, outlining the shared objective, how the partnership was structured, and the outcomes achieved.
•Evidence of specific collaborative practices (e.g., shared risk, joint problem-solving, co-innovation) rather than a standard vendor-client relationship.
•Measurable results tied directly to the collaboration (cost, time, quality, or innovation outcomes).
•Optional: testimonials from each partner organization confirming the nature and value of the collaboration.
•Note: the award will be given to the end-user.
Impact Awards
Community Impact Project of the Year
This award honors a data center initiative that has made a meaningful, positive difference to the local community in which it operates. This may include job creation, education and skills programs, charitable partnerships, local infrastructure investment, or environmental stewardship. The winning entry will demonstrate authenticity, scale, and sustained impact in its community engagement.
Entry Criteria:
•Entry must describe the specific community initiative, its objectives, and the geographic or demographic community served.
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written submission detailing the activities undertaken, resources invested, and the duration of the program.
•Evidence of measurable impact (e.g., number of people reached, jobs created, funds raised, environmental benefit). •Testimonials or endorsements from community partners, local organizations, or beneficiaries.
•Optional: media coverage or photographic/video evidence of the initiative in action.
Talent Development Initiative of the Year
This award recognizes an organization's standout initiative in attracting, developing, or retaining talent within the data center industry. Entries might include apprenticeship schemes, upskilling programs, diversity and inclusion efforts, or structured career pathways. The winning entry will demonstrate strong program design, measurable outcomes, and a genuine contribution to addressing the industry's talent and skills challenges.
Entry Criteria
•Entry must describe the specific program or initiative, its goals, and target population (e.g., apprentices, graduates, underrepresented groups, existing staff).
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written submission outlining program design, implementation, and duration.
•Measurable outcomes such as retention rates, promotion rates, skills certifications achieved, or diversity metrics improved.
•Evidence of participant feedback or testimonials.
•Optional: comparison data showing improvement against prior years or industry benchmarks.
Energy, Sustainability and Impact
Data Center Sustainability Impact Award
This award recognizes a project or initiative that has made a significant contribution to the environmental sustainability of data center operations. This may include renewable energy adoption, carbon reduction strategies, water conservation, circular economy practices, or broader ESG achievements. The winning entry will demonstrate measurable sustainability outcomes and a meaningful contribution to a more responsible data center sector.
Entry Criteria:
•Entry must detail the specific sustainability project or initiative, including the facility or scope involved and the timeframe of implementation.
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written case study describing the sustainability challenge addressed, the approach taken, and the measurable outcomes achieved.
•Quantifiable data demonstrating impact (e.g., carbon reduction, water savings, renewable energy percentage, waste diversion, cost savings).
•Supporting documentation such as sustainability audits, certifications, or third-party verification.
•Optional: evidence of scalability, replicability, or alignment with broader ESG goals and reporting frameworks.
Emerging Energy Technology Project of the Year
This award honors the application of a cutting-edge or emerging energy technology within a data center setting — such as next-generation storage, hydrogen fuel cells, advanced cooling-linked energy systems, or novel grid integration approaches. The winning entry will demonstrate forward-thinking adoption of such technologies, along with evidence of real-world feasibility and results.
Entry Criteria:
•Entry must identify the emerging technology used and explain why it qualifies as emerging or early-stage within the industry.
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written submission describing the use case, implementation process, and technical or operational challenges overcome.
•Evidence of real-world performance data, even if from a pilot or limited deployment.
•Explanation of the technology's potential future impact or scalability across the sector.
•Optional: partnerships with technology developers, research institutions, or pilot program documentation.
Design and Construction
Data Center Design Project of the Year
This award recognizes a data center project that has achieved outstanding excellence in architectural, engineering, or facility design. This category considers how functional infrastructure can be delivered through thoughtful, creative, and well-integrated design — whether through visual aesthetics, spatial efficiency, environmental integration, or technical ingenuity. The winning entry will demonstrate how design choices enhanced both the facility's performance and its surrounding context.
Entry Criteria:
•Entry must identify the facility and describe the design brief, including the key architectural, engineering, or environmental integration goals.
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written submission describing the design approach, materials or methods used, and how design goals were balanced with technical and functional requirements.
•High-quality photographs, renderings, or technical drawings of the completed facility.
•Evidence of design recognition, such as architectural input, awards, or stakeholder/community feedback.
•Optional: sustainability or local-context integration details tied to the design choices.
Data Center Construction Innovation Project of the Year
This award celebrates innovation in the design, build, or delivery of data center construction projects. This may include modular or prefabricated construction methods, accelerated build timelines, novel engineering solutions, or improved safety and sustainability practices during the build phase. The winning entry will have redefined what's possible in data center construction speed, quality, or efficiency.
Entry Criteria:
•Entry must describe the specific construction project, including methodology used (e.g., modular, prefabricated, accelerated build) and overall project scope.
•The project must have taken place, or been substantially implemented, within the eligibility period (the past 12-18 months).
•A written case study outlining the construction challenge, the innovative approach taken, and the build timeline achieved versus industry norms.
•Measurable outcomes such as time savings, cost efficiency, safety performance, or sustainability improvements during construction.
•Supporting documentation such as project timelines, photographs, or third-party verification.
•Optional: evidence of safety record improvements or lessons learned applicable to future builds.



